House Finishing Cost in Lahore – Complete 2025 Breakdown by Category
Once the grey structure is complete, the next major phase in building your home is finishing—the stage where your house transforms into a livable, personalized space. Finishing is also where construction costs can spiral if not planned properly.
In this detailed guide, we’ll break down the complete house finishing cost in Lahore (2025) by category—covering flooring, ceilings, paint, sanitary, electrical, woodwork, and more. Whether you’re building in DHA, Bahria Town, Lake City, or LDA City, this article will help you plan smarter.
✅ What Does House Finishing Include?
Finishing refers to all visible and usable parts of the house after grey work ends:
- Tile/marble flooring
- False ceilings
- Wall paint & polish
- Kitchens and wardrobes
- Bathrooms and vanities
- Sanitary and electrical fittings
- Doors, windows, cabinetry
- Railings, grills, and windows
📊 Average Finishing Cost in Lahore (2025)
Plot Size | Covered Area (sft) | Estimated Cost Range |
5 Marla | ~2,000 sft | PKR 5.5M – 6.5M |
10 Marla | ~3,300 sft | PKR 8.5M – 10.5M |
1 Kanal | ~5,200 sft | PKR 14M – 17M |
Estimates depend on finish quality (standard vs premium) and item selections.
🧾 Finishing Cost Breakdown by Category
1. Flooring (Tiles / Marble / Wooden)
- Local tiles: PKR 180 – 300/sft
- Spanish tiles: PKR 400 – 800/sft
- Marble (Ziarat, Verona): PKR 350 – 1,200/sft
- Wooden laminate: PKR 500 – 1,200/sft
Estimated Cost:
- PKR 2.0M – 3.5M (10 Marla)
- PKR 3.0M – 5.0M (1 Kanal)
2. False Ceilings
- Gypsum or POP
- Cove lighting and central designs
Estimated Cost:
- PKR 350 – 500/sft
- PKR 500K – 1.2M (depending on area)
3. Paint & Polish
- Plastic emulsion (interior)
- Weather shield (exterior)
- Wall putty, primer, and finishing coats
Estimated Cost:
- PKR 600K – 1.5M
- Polish for wood adds PKR 400K – 800K
4. Kitchens & Wardrobes
- MDF, UV, High-gloss cabinets
- Granite or quartz countertops
Estimated Cost:
- PKR 1.5M – 2.5M for 10 Marla
- PKR 2.5M – 4.5M for 1 Kanal
5. Sanitary Fittings
- Commode, vanity, shower set, accessories
- Brands: Porta, Sonex (standard); Grohe, Duravit (premium)
Estimated Cost:
- PKR 600K – 1.5M
6. Electrical Fixtures
- DB board, wiring, switches, fans, lights
- Brands: GFC, Philips, Schneider
Estimated Cost:
- PKR 800K – 1.5M
7. Doors, Woodwork, and Windows
- Kail or engineered wood
- Ashwood or solid options (premium)
- Aluminum or UPVC windows
Estimated Cost:
- PKR 2.0M – 3.5M (10 Marla)
- PKR 3.5M – 6.0M (1 Kanal)
8. Railings, Grills & Misc. Metal Work
- Staircase and terrace railings
- Safety grills and main gate accessories
Estimated Cost:
- PKR 300K – 800K
💡 Tips to Optimize Finishing Budget
- Use premium finishes in visible areas (drawing, powder room)
- Mix local materials in bedrooms, kitchens, and corridors
- Choose pre-finished doors or laminated panels over solid wood
- Limit false ceiling designs to main lounge and living areas
- Finalize all selections before work begins to avoid costly rework
📍 Lahore-Specific Considerations
Society | Notes |
DHA | High-end finishes expected; budget for polish & false ceilings |
Bahria Town | Imported tile trend drives up cost; plan kitchen sizes carefully |
Lake City | Cost-efficient local materials recommended |
Park View City | Kitchens, wardrobes, and ceiling lights are focus points |
🔗 Related Guides on Construction Planning
- Turnkey House Construction Cost in Lahore – Full Breakdown
- Budget-Friendly Tips for Building a Modern Home in Lahore
- Plot Size vs Construction Cost – How to Optimize Your Budget
- Grey Structure Cost Per Square Foot in Lahore
📢 Final Thoughts: Plan Ahead, Finish Smart
Finishing work is where your house becomes a home. With the right selections and expert guidance, you can control your costs while still creating a high-end interior experience. Start by locking in a finishing BOQ, finalize your designs early, and build with clarity, not assumptions.
Add Comment